Unhitching The 2650/2655 Balebuster; Starting The Machine - Haybuster 2650 Operating Instructions Manual

Balebuster
Table of Contents

Advertisement

3.5 Unhitching the 2650/2655 BALEBUSTER

To unhitch the 2650/2655 BALEBUSTER, perform the following steps:
1.
Follow normal shut-down procedure.
2.
Lower jack and secure. Raise the tongue off of the tractor draw bar.
3.
Detach the P.T.O. shaft from the tractor.
4.
Cycle the hydraulic control levers to release any pressure in the hydraulic hoses.
5.
Detach the hydraulic hoses.
6.
Remove the safety chain, if installed.
7.
Remove the hitch pin.

3.6 Starting the machine

DANGER: After making all necessary hook-ups to tractor, be sure rotor chamber is clear of any
solid objects. Make sure any bystanders are away from the 2650/2655 BALEBUSTER before
engaging P.T.O., conveyor or loader. Flying objects can cause serious injury or death. Stay clear
of discharge side of machine unless operator has stopped tractor engine and machine has stopped
rotating. Failure to follow these instructions may result in severe injury or death.
To start the machine, perform the following steps:
1.
Unfold the rack into working position. Adjust the deflector to desired position.
2.
Steps 3 through 5 are performed with the tractor at idle, and the operator at the tractors controls.
3.
Engage the conveyor. Run the conveyor in forward and then in reverse. Check to be sure the conveyor is
working properly before attempting to shread a bale.
4.
Raise the loader, and remove transport pins.
CAUTION: Look out for overhead hazards such as power lines.
WARNING: Never stand under loader when removing transport pins. Do not attempt to force pins
out, with the loader fully raised they can be easily removed.
28
2 6 5 0 / 2 6 5 5 B A L E B U S T E R
O P E R A T I N G I N S T R U C T I O N S

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2655

Table of Contents