Fujitsu AB*A30LBT Service Instruction page 31

Large ceiling type inverter
Table of Contents

Advertisement

3. Defrost Flow Chart
The defrosting shall proceed by the integrating operation time
and outdoor heat exchanger emperature as follows.
(In case of 1st defrost)
Compressor integrating
Compressor integrating
operation:
operation:
Over 17 minutes to
Over 62 minutes to
below 62 minutes
below 240 minutes
Outdoor
heat exchanger
temperature:
Below - 9°C
Outdoor temp -
Outdoor heat exchanger
temperature:
Above 5 degC
Heating operation start : Compressor ON
Compressor integrating
operation:
Over 240 minutes
Outdoor
Outdoor
heat exchanger
heat exchanger
temperature:
temperature:
Below - 5°C
Below - 3°C
Defrost start
Defrost Indicator:
[Operation lamp]
7 sec ON / 2 sec OFF
Outdoor heat exchanger temperature: Over 13°C
Compressor ON time: Over 15 minutes
Defrost end
(Not defrosted for 10 minutes)
Compressor integrating
operation:
Over 35 minutes to
below 240 minutes
or
05-16
(In case of 2nd and later defrost)
Compressor integrating
operation:
Over 240 minutes
Outdoor
Outdoor
heat exchanger
heat exchanger
temperature:
temperature:
Below - 6°C
Below - 3°C
AB*A30/ 36LBTL
Outdoor fan : OFF
Compressor frequency : 0 Hz
EEV : 480pulse
4-way valve : OFF
Outdoor fan : OFF
Compressor frequency : 70Hz

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents