Gas Connection - Fisher & Paykel OR30SDPWGX Installation Instructions Manual

Gas/electric range
Hide thumbs Also See for OR30SDPWGX:
Table of Contents

Advertisement

Available languages

Available languages

2
All gas connections must be made according to national and local codes. This gas supply
(service) line must be the same size or greater than the inlet line of the appliance. Sea-
lant on all pipe joints must be resistant to the action of LP/Propane gas.
The range is equipped for the use with NATURAL gas. It is design-certified by CSA Inter-
national for NATURAL and L.P. gases with appropriate conversion.
The model/serial rating plate, located below the bottom drawer, has information on the
type of gas that can be used. If this information does not agree with the type of gas avai-
lable, check with the local gas supplier. See page from 16 to 19 for L.P. gas conversion
instructions.
1. Manual Shut-off Valve
A manual shut-off valve must be installed in an accessible location in the gas line external
to the appliance for the purpose of turning on or shutting off gas to the appliance (In Mas-
sachusetts such shutoff devices should be approved by the Board of State Examiners of
Plumbers & Gas Fitters).
This valve should be located in the same room as the range and should be in a location
that allows ease of opening and closing (in a position where it can be reached quickly in
the event of an emergency).
Do not block access to the shutoff valve. The valve is for turning on or shutting off gas
to the appliance.
To range
2. Pressure Regulator:
a.
All heavy duty, commercial type cooking equipment must have a pressure regulator
on the incoming service line for safe and efficient operation, since service pressure
may fluctuate with local demand.

Before installing the regulator mount the 1/2" NPT (conical) male connector to the
regulator (see picture 2.2).

Gasket supplied has to be placed between 1/2" NPT (conical) connector/extension
pipe male pipe fitting (see picture 2.3).

The regulator supplied with this range must be installed before any gas connections
are made.

Use supplied pressure regulator only.
12

gas connection

:
(fig: 2.1)
Shuto valve
"open" position
Gas supply line
Use a new CSA or UL approved
gas supply line.
Install a shut-off valve.
Securely tighten all gas connec-
tions.
If connected to LP, have a quali-
fied person make sure gas pres-
sure does not exceed 14" water
column.
Examples of a qualified person
include licensed heating per-
sonnel, authorized gas compa-
ny personnel, and authorized
service personnel.
Failure to do so can result in
death, explosion, or fire.
Fig. 2.1
Explosion Hazard

Advertisement

Table of Contents
loading

Table of Contents