Normal Procedures; Preflight Inspection - Cirrus SR22 Pilot Operating Handbook

Aircraft serials 22-3915 & subsequent 3600 pound takeoff weight
Table of Contents

Advertisement

Section 4

Normal Procedures

Normal Procedures

Preflight Inspection

Before carrying out preflight inspections, ensure that all required
maintenance has been accomplished. Review your flight plan and
compute weight and balance. Throughout the walk-around: check all
hinges, hinge pins, and bolts for security; check skin for damage,
condition, and evidence of delamination; check all control surfaces for
proper movement and excessive free play; check area around liquid
reservoirs and lines for evidence of leaking.
In cold weather, remove all frost, ice, or snow from fuselage, wing,
stabilizers and control surfaces. Ensure that control surfaces are free
of internal ice or debris. Check that wheel fairings are free of snow and
ice accumulation. Check that Pitot probe warms within 30 seconds of
setting Pitot Heat to ON.
6
1. Cabin
a. Required Documents................................................ On Board
b. Avionics Power Switch ......................................................OFF
4-4
5
7
8
10
9
(Continued on following page)
4
2
1
13
11
Cirrus Design
SR22
3
12
SR22_FM04_1454
P/N 13772-004
Original Issue

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents