6.9.1 1+1 HSB/FD Adaptive Modulation and 1+1 EPS to 1+0 Adaptive Modulation ............... 931
6.9.2 1+1 HSB/FD Static Modulation and 1+1 EPS to 1+0 Static Modulation ......................... 932
6.10 Cleaning.............................................................................................................................. 932
7 LINE–UP AND COMMISSIONING ............................................................................................... 933
7.1 Introduction .......................................................................................................................... 934
7.1.1 General ........................................................................................................................... 934
7.1.2 Safety–EMC–EMF–ESD norms and cautions to avoid equipment damage ................... 935
7.1.3 Conventions.................................................................................................................... 935
7.1.4 Summary of the line–up, commissioning, and acceptance phases ................................ 936
7.1.5 General information about test bench drawings ............................................................. 937
7.2 Commissioning of STATION A – phase 1 (Turn up).......................................................... 938
7.2.1 Turn–on preliminary operations ...................................................................................... 938
7.2.2 Powering up the MSS(s) with ODU(s) connected........................................................... 939
7.3 Commissioning of STATION B – phase 1 (Turn up).......................................................... 940
7.4 Fine antenna alignment and preliminary checks – Stations A & B ................................. 940
7.4.1 Fine antenna alignment .................................................................................................. 940
7.4.2 Preliminary checks.......................................................................................................... 940
7.5 End of commissioning phase 1 (Turn up) in STATION A ................................................. 944
7.6 Commissioning station A – phase 2 (acceptance test) .................................................... 945
7.6.1 Installation and cabling visual inspection ........................................................................ 947
7.6.2 System configuration ...................................................................................................... 947
7.6.3 P32E1 unit ...................................................................................................................... 952
7.6.4 STM-1 unit ...................................................................................................................... 955
7.6.5 16E1/DS1 ASAP unit ...................................................................................................... 958
7.6.6 AUX unit.......................................................................................................................... 958
7.6.7 EAS unit.......................................................................................................................... 959
7.6.8 Core-E unit...................................................................................................................... 959
7.6.9 NE configuration ............................................................................................................. 959
7.6.10 Data/Time settings ........................................................................................................ 960
7.6.11 E1 Hop stability test ...................................................................................................... 960
7.6.12 STM-1 Hop stability test................................................................................................ 962
7.6.13 Ethernet Traffic stability test.......................................................................................... 964
7.6.14 ATM Traffic stability test ................................................................................................ 968
7.6.15 64 kbit/s Service Channel functionality test (optional) .................................................. 970
7.7 Commissioning station B – Phase 2 (acceptance Test) ................................................... 971
7.8 Final operations ................................................................................................................... 971
7.9 Annex A: fine antenna alignment ....................................................................................... 971
ABBREVIATIONS ............................................................................................................................ 973
CUSTOMER DOCUMENTATION FEEDBACK.............................................................................. 979
9500 MPR Rel. 3.1
6/980
3DB18809AAAA Issue 1
User Manual
Table of Contents

Advertisement

Table of Contents
loading

Table of Contents