Connect Primary / Battery Power D/C Units Only; Connect Converter To Operator; Install Vent Cap - B&B ARMR LXL-15vp-SS Installation Manual

Lxl series hydraulic slide gate operators
Table of Contents

Advertisement

Installation and Operations Manual — LXL Gate Operator

4.7 Connect Primary / Battery Power D/C Units Only

4.8 Connect Converter To Operator

4.9 Install Vent Cap

B&B ARMR
A Division of B&B Roadway and Security Solutions
1. Connect the primary power to
switch S1B and the batteries to
switch S1A in the converter
enclosure.
2. Earth ground the enclosure.
THIS IS NOT AN OPTION!
3. Drive a solid copper rod at least
36" into the ground.
4. Using a #10 solid copper wire,
connect ground wire from the rod
to the ground lug located in the
control cubicle.
1. Connect the converter enclosure
to switch S4 in the gate operator
using #6 AWG wire.
2. Earth ground the operator. THIS
IS NOT AN OPTION!
3. Drive a solid copper rod at least
36" into the ground.
4. Using a #10 solid copper wire,
connect ground wire from the
rod to the ground lug located in
the operator.
1. Locate the red plug on the
hydraulic reservoir.
2. Remove the red plug and replace
with the supplied vent cap.
3. Keep the red plug should
removal of the vent cap be
necessary.
0054-9001UL Revision A2