Mitsubishi AE-200A Instruction Book page 212

Air conditioning control system centralized controller
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

[3] General Equipment
Output this check sheet for each AE-200 system.
(4)
(3)
(1) Checking the group configuration
Check for proper group registration and unit information for the general equipment contact.
(2) Checking the block configuration
Check for proper block configuration for the general equipment contact.
(3) Checking the energy management block (EM block) configuration
Check for proper energy management block (EM block) configuration for the general equipment contact.
(4) Checking the floor configuration
Check for proper floor configuration for the general equipment contact.
(5) Checking the operation between centralized controllers and air conditioning units
Check the operation status of centralized controllers and general equipment by turning on/off the general
equipment contact or generating an error, and check for proper settings and connections.
WT07627X03
(1)
(5)
212
(2)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50eEw-50aAe-200eAe-50e

Table of Contents