Carrier 38XTZ 007-024 Installation, Operation And Maintenance Instructions page 24

Split system air-cooled
Table of Contents

Advertisement

-
The clearance between the units must be sufficient to
ensure that the discharge air from one unit does not mix
with the supply air of another unit.
38XTZ 014
-
If the air enters through the units on one side only and is
discharged through the top, the clearances can be reduced.
38XTZ 011, 016, 020 and 024
Return air
-
The air enters through three sides and is discharged
through the top.
Table 8 - Minimum clearances between units (mm)
38XTZ
A
007 and 008
200
014
500
011, 016, 020 and 024
500
24
Return air
Return air
PLAN VIEW
Fig. 24
Return air
Return
air
Return air
Return
air
Return air
Return
air
PLAN VIEW
Fig. 25
B
C
500
400
700
500
700
500
Installation on the ground
-
38XTZ units can be positioned on the floor of a patio, on
the ground or on a lawn. If installed on the ground or on
the lawn they should be mounted on a 100 mm high
concrete base that is 100 mm larger than the base unit on
all four sides.
38XTZ 007 and 008
38XTZ 011 to 024
Concrete base
-
If this type of installation is used, ensure that the units are
not affected by flooding, snow accumulation or leaves.
-
Ensure that the units are secured to prevent injuries to
people handling or working on the units.
IMPORTANT: Rainwater is drained through the unit base.
For this reason the units must be elevated above the concrete
base to allow correct drainage.
-
Rainwater drainage
38XTZ units incorporate drillholes in the base in order to
correctly drain any condensate or rainwater which may
enter the unit in the fan area. Ensure correct drainage.
Concrete base
Fig. 26
Fig. 27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents