13. Do not pull the lover shrouds tight until the jib has been hoisted and the
rig tension applied.
1. Unpack the boom
3. Affix the lower vang
purchase to the ring on the
mast step as shown.
3.5 Rigging the Boom
15
12. Loosely attach the rope
ends of the lower
shrouds to the D ring on
the front of the mast just
above the boom.
2. Attach the boom to the
mast