Commissioning; Step-By-Step Guide To Hardware Setup (Ciu 300) - Grundfos CIU 300 Functional Profile And User Manual

Bacnet ms/tp for hydro mpc, control mpc and multi-e
Table of Contents

Advertisement

8. Commissioning

8.1 Step-by-step guide to hardware setup (CIU 300)

Step
Action
1
Complete the booster configuration, e.g. sensor configuration.
2
Select the BACnet MAC address (0-127) on the CIM 300. See section
3
Select the transmission speed of the CIM 300. See section
4
Select Device Object Instance Number. See section
5
If necessary, set line termination. See section
6
Connect the GENIbus cable from the CIU 300 to the booster.
7
Connect the necessary cables from the CIU 300 to the BACnet network. See section
8
Connect the power supply cable to the CIU 300, and switch it on.
Confirm that the GENIbus LED is constantly green and that the BACnet LED is either off or flashing green
9
(indicating communication). See section
The CIU 300 is now configured and ready.
20
3.7 Selecting the BACnet MAC address
3.4 Setting the BACnet transmission speed
3.5 Selecting the Device Object Instance Number
3.8 Termination resistor
.
4. LEDs
.
.
.
.
3.3 Connecting to the BACnet network
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents