Aerotech BT 400-46 Installation And Operation Maintenance page 6

Table of Contents

Advertisement

Table of Contents
• • • • • • • • • • • • • • • • • •
PARTS LIST
LIST OF ILLUSTRATIONS:
FIGURE NO. TITLE
2-1
2-2
4-1
4-2
4-3
4-4
4-5
4-6
4-7
4-8
5-1
5-2
5-3
5-4
5-5
5-6
LIST OF TABLES:
TABLE NO. TITLE
2-1
2-2
4-1
5-1
5-2
5-3
Heater Fuel System
Sectional View of Nozzle and Combustor
Control Panel Components
Schematic Diagram of Fuel Pump
Burner Control Valve
Fuel Atomizing Head
Temperature Selector Valve
Heater Electrical System Circuit
Duct Attachments
Fuel Gauge and Flame Window Location
Fuel Pump Mounting Bracket
Nozzle and Combustor
Igniter Plug Adjustment Points
Valve and Block Assembly
Pump Pressure Testing Assembly
Fuel System Air Leak Testing
Specifications
Fuel Specifications and Requirements
Control and Indicator Locations and Use
Lubrication Instructions
Inspection, Checks and Services
Troubleshooting Chart
AEROTECH HERMAN NELSON INTERNATIONAL INC.
100 Eagle Drive, Winnipeg, Manitoba Canada R2R 1V5
Phone: 204-633-1999 (24 Hours) Fax: 204-694-1612 Email: sales@hermannelson.com
V
www.hermannelson.com
06.19.09 REVISION 1.03
PAGE
2
4
9
10
12
13
15
16
19
20
27
30
31
32
33
35
PAGE
3
3
9
23
24
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents