Air Intake Kit For Chamber (Cz-Atu2) - Panasonic S-22MU1E5A Technical Data Manual

Vrf systems indoor unit
Hide thumbs Also See for S-22MU1E5A:
Table of Contents

Advertisement

4. Optional Parts
4-5. Air Intake Kit for Chamber
CZ-ATU2
Duct connection box
Installation Instructions
1. Accessories
Check that the following parts are in the box when unpacking.
Supplied parts
Duct connection box
Duct connection box
installation bracket
Installation flange
( o100)
Instruction screw
Thermal insulation
for installation screws A
Thermal insulation
for installation screws B
2. Installation
NOTE
Install the duct connection box after installing
the indoor unit. Also, because the duct
connection box is attached to the air-intake
plenum, use sufficient care when handling it.
Especially avoid any impacts on the side of
the air-intake plenum, as this can result in
damage.
Follow the instructions in the air-intake plenum
installation instructions and install the air-intake
plenum on the indoor unit.
(1) Remove the sealing plate from the air-intake
plenum.
(2) Fit the duct connection flange and installation
bracket into the duct connection box.
Fasten with the supplied 8 installation screws.
(3) Fasten the duct connection box to the air-intake
plenum with the 6 installation screws.
(4) Apply the supplied thermal insulation A and B to
the installation screws.
Q'ty
Remarks
1
1
1
Duct flange
14
2
Polyethylene foam T2
Polyethylene foam T5
2
Indoor unit
Air-intake plenum
2-63
Design of VRF SYSTEM
Thermal insulation
for installation screws B
Sealing plate
Thermal insulation
for installation screws A
1
2
3
4
5
6
7
8
9