7A. Loosen Ball Knob Pop Pin (102) then mount Leg Hold Down (P) into
Attachment Holder (I) and Secure into position by tightening the Ball Knob
Pop Pin (102).
7B. Insert a Foam Roller Tube (Q) midway along its length into the upper
holes on the Leg Hold Down (P). Use Two Foam Roller (222 & 223) and slide
one on to each exposed side of the Foam Roller Tube (Q). Insert a Round
Cap (120) on to each side of Foam Roller Tube (Q) using:
2 - (120) Round Cap D25.4xD65x31.5
2 - (222 & 233) Foam Roller D23xD100x200L
7C. Insert a Foam Roller Tube (Q) midway along its length into the lower
holes on the Leg Hold Down (P). Use Two Foam Rollers (222 & 223) and
slide one on to each exposed side of the Foam Roller Tube (Q). Insert a
Round Cap (120) on to each side of Foam Roller Tube (Q) to keep the Foam
Rollers in place using:
2 - (120) Round Cap D25.4xD65x31.5
2 - (222 & 233) Foam Roller D23xD100x200L
STEP 7
24