Removal Of P-Module; Removal Of Lamp Unit; Removal Of Analysis Block And Projection Lens - Panasonic PT-FW100NTU Service Manual

Hide thumbs Also See for PT-FW100NTU:
Table of Contents

Advertisement

PT-FW100NTU / PT-FW100NTE / PT-FW100NTEA
12. Unscrew the 4 screws and remove the B/Q-Module.

7.15. Removal of P-Module

1. Remove the power unit according to the steps 1 through 11
in the section 7.14. "Removal of B/Q Module".
2. Unscrew the 4 screws and remove the P-Module.

7.16. Removal of Lamp Unit

1. Loosen the 2 screws until they idle, remove the lamp unit
cover.
2. Loosen the 2 screws until they idle, remove the lamp unit
with the handle.
Note:
· When installing the lamp unit in the main unit, place
it in a specified position and press the right and left
sides of the lamp unit (arrow positions shown in the
figure below), and confirm the lamp unit is inserted
securely.
Then, tighten the 2 screws fixing the lamp unit, and
attach the lamp unit cover.
7.17. Removal of Analysis Block
and Projection Lens
1. Remove the lamp unit according to the section 7.16.
"Removal of Lamp Unit".
2. Remove the A-P.C.Board block according to the steps 1
through 4 in the section 7.3. "Removal of A-P.C.Board".
3. Open the front door.
4. Unscrew the 1 screw and remove the front cover (inside).
5. Unscrew the 1 screw and remove the grounding terminal.
6. Unscrew the 2 screws and remove the power separation
wall.
7. Remove the front cover.
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt-fw100ntePt-fw100ntea

Table of Contents