PT-AE900U / PT-AE900E
3. Unscrew the 3 screws and remove the J-P.C.Board.
[For PT-AE900U]
[For PT-AE900E]
6.6.
Removal of B/Q-Module
1. Remove the upper case according to the section 6.2.
"Removal of Upper Case".
2. Remove the A-P.C.Board block according to the steps 2
through 3 in the section 6.3. "Removal of A-P.C.Board".
3. Unscrew the 2 screws and remove the S-P.C.Board.
4. Unhook the hook section and remove the duct cover.
5. Unscrew the 1 screw and remove the ground fittings.
6. Unscrew the 1 screw and release the ballast block.
7. Unscrew the 2 screws and remove the power box with
power shield plate.
8. Unscrew the 2 screws and remove the lamp unit terminal.
All manuals and user guides at all-guides.com
9. Disconnect the connector P2 and remove the ballast block.
10. While sliding the ballast grounding metal, unhook the hook
section and remove it.
11. Unhook the hook section of resin spacers and remove the
B/Q-Module.
6.7.
1. Remove the power box according to the steps 1 through 7
in the section 6.6. "Removal of B/Q-Module".
2. Unscrew the 2 screws and remove the P-Module.
16
Removal of P-Module