Quick Start for Experienced Users
16
Required Tools and
Equipment
Procedures
1.
Check the contents of the shipping box.
Unpack the shipping boxes making sure that the contents include:
• SLC 500 modular processor
– installation instructions (publication 1747-IN009)
• SLC 500 modular chassis (catalog numbers 1746-A4, 1746-A7, 1746-A10, or
1746-A13)
– installation instructions (publication 1746-IN016)
• SLC 500 modular power supplies (catalog numbers 1746-P1, 1746-P2,
1746-P3, 1746-P4, 1746-P5, 1746-P6, or 1746-P7)
– installation instructions (publication 1746-IN004)
If the contents are incomplete, call your local Rockwell Automation representative
for assistance.
Publication 1747-UM011G-EN-P - June 2008
Have the following tools and equipment ready:
• Medium blade screwdriver
• Programming equipment
• Compatible communication cable and/or interface (The table
below indicates with an X, which cables are compatible with the
SLC 5/01 through 5/05 processors.)
Network Interface
Processor
SLC 5/01
1747-UIC
1747-PIC
1747-CP3
1784-PKTX(D)
1784-PCMK
10/100Base-T Ethernet
(1)
Requires 1747-C13 cable.
(2)
Requires 1784-CP14 cable.
(3)
Requires 1784-PCM4 cable.
(4)
Requires 1747-CP3 cable.
(5)
Requires 1784-PCM6 cable.
SLC 5/02
SLC 5/03
(1)
(1)
(1)(4)
X
X
X
X
X
X
X
(2)
(2)
(2)
X
X
X
(3)
(3)
(3)
X
X
X
SLC 5/04
SLC 5/05
(4)
(4)
X
X
X
X
X
(5)
X
X
Reference