Required Tools And Equipment; Procedures - Allen-Bradley SLC 500 User Manual

Slc 500 modular hardware style
Hide thumbs Also See for SLC 500:
Table of Contents

Advertisement

Quick Start for Experienced Users
16
Required Tools and
Equipment

Procedures

1.
Check the contents of the shipping box.
Unpack the shipping boxes making sure that the contents include:
• SLC 500 modular processor
– installation instructions (publication 1747-IN009)
• SLC 500 modular chassis (catalog numbers 1746-A4, 1746-A7, 1746-A10, or
1746-A13)
– installation instructions (publication 1746-IN016)
• SLC 500 modular power supplies (catalog numbers 1746-P1, 1746-P2,
1746-P3, 1746-P4, 1746-P5, 1746-P6, or 1746-P7)
– installation instructions (publication 1746-IN004)
If the contents are incomplete, call your local Rockwell Automation representative
for assistance.
Publication 1747-UM011G-EN-P - June 2008
Have the following tools and equipment ready:
• Medium blade screwdriver
• Programming equipment
• Compatible communication cable and/or interface (The table
below indicates with an X, which cables are compatible with the
SLC 5/01 through 5/05 processors.)
Network Interface
Processor
SLC 5/01
1747-UIC
1747-PIC
1747-CP3
1784-PKTX(D)
1784-PCMK
10/100Base-T Ethernet
(1)
Requires 1747-C13 cable.
(2)
Requires 1784-CP14 cable.
(3)
Requires 1784-PCM4 cable.
(4)
Requires 1747-CP3 cable.
(5)
Requires 1784-PCM6 cable.
SLC 5/02
SLC 5/03
(1)
(1)
(1)(4)
X
X
X
X
X
X
X
(2)
(2)
(2)
X
X
X
(3)
(3)
(3)
X
X
X
SLC 5/04
SLC 5/05
(4)
(4)
X
X
X
X
X
(5)
X
X
Reference

Advertisement

Table of Contents
loading

Table of Contents