Required Tools And Equipment; Procedures - Allen-Bradley SLC 500 User Manual

Modular hardware style
Hide thumbs Also See for SLC 500:
Table of Contents

Advertisement

1-2
Quick Start for Experienced Users
Required Tools and
Equipment

Procedures

1.
Check the contents of the shipping box.
Unpack the shipping boxes making sure that the contents include:
• SLC 500 Modular Processor
– installation instructions (Publication 1747-5.25 or 1747-IN009A-EN-P)
• SLC 500 Modular Chassis (Catalog Numbers 1746-A4, 1746-A7, 1746-A10, or
1746-A13)
– installation instructions (Publication Number 1746-IN016A-EN-P)
• SLC 500 Modular Power Supplies (Catalog Numbers 1746-P1, 1746-P2,
1746-P3, 1746-P4, 1746-P5, 1746-P6, or 1746-P7)
– installation instructions (Publication Number 1746-IN004A-ML-P)
If the contents are incomplete, call your local Rockwell Automation representative
for assistance.
Publication 1747-UM011C-EN-P - December 2001
Have the following tools and equipment ready:
• medium blade screwdriver
• programming equipment
• compatible communication cable and/or interface (The table
below indicates with an "X", which cables are compatible with
the SLC 5/01 through 5/05 processors.)
Processor
SLC 5/01
1747-PIC
1747-CP3
1747-KTX, -PKTX
1747-PCMK
10Base-T EtherNet
(1) requires 1784-CP14 cable
(2) requires 1784-PCM4 cable
(3) requires 1784-CP13 cable
(4) requires 1784-PCM6 cable
SLC 5/02
SLC 5/03
X
X
X
X
(1)
(1)
(1)
X
X
X
(2)
(2)
(2)
X
X
X
SLC 5/04
SLC 5/05
X
X
(3)
X
(4)
X
X
Reference

Advertisement

Table of Contents
loading

Table of Contents