Preliminary Checks - Mitsubishi FX1S-10MR-ES/UL Hardware Manual

Fx1s series
Table of Contents

Advertisement

FX1S Series Programmable Controllers
7.
Diagnostics
7.1

Preliminary Checks

Table 7.1: Preliminary Checks
POWER
Check power supply, ground and I/O cables are wired correctly.
RUN
ERROR
Turn the power supply on. Check the power LED is lit. Down load a small
test program into the PLC. Verify the program to ensure it has been written
POWER
RUN
to the PLC correctly. Using the programming device forcibly turn ON/OFF
ERROR
each output. Check the output LEDs for operation.
Put the PLC into RUN. Check the RUN LED is lit. Check the previously down
POWER
RUN
loaded program works correctly. Once all checks are complete take the PLC
ERROR
out of run and turn OFF the power supply.
During this testing stage take extreme care not to touch any live or
hazardous parts.
Diagnostics 7
7-1