Before Installing; Parts - Aquacal Pool Pilot Digital Nano Owner's Manual

Table of Contents

Advertisement

8.2 BEFORE INSTALLING

Determine everything needed for installation is on hand.
Determine where the Manifold Assembly will be plumbed.
Identify a suitable mounting location for the Digital Nano/Nano + within proper cord length to the
manifold.
Plan runs for cell and Tri-Sensor Cables.
Plan wire runs and wiring connections for source power.
Determine origination point for control center power feed:
o Directly from a circuit breaker (Circuit breaker is used to power the Digital Nano/Nano +
and circulation pump.)
o From an external timer or an electronic controller (Digital Nano/Nano + is to be wired to
the same location as the circulation pump; the Digital Nano/Nano + is activated when the
circulation pump is energized.)
Determine whether the input voltage for the Digital Nano/Nano + will be 115 Vac or 230 Vac.

8.3 PARTS

Before attempting the installation, verify the following items have been included with the Digital
Nano/Nano + :
Included
QUANTITY
1
1
4
4
QUANTITY
1
1
4
4
Not included
Power service electrical wire.
½" liquid tight (nonmetallic flex) conduit
Digital Nano/Nano + Controllers -115 Vac
Power Cord with 115 Volt Plug – 3 feet
Cell Cable
Plastic Anchors
Mounting Screws
Digital Nano/Nano + Controllers - 220 Vac
6 Foot AC Power Leads
Cell Cable
Plastic Anchors
Mounting Screws
DESCRIPTION
DESCRIPTION
Page 23
Table 4
Table 5
Table 6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pool pilot digital nano plus

Table of Contents