STEP 7
Install the Wall Switches into the gang boxes and install the
faceplates.
STEP 8
Extend the pull out tab on the front of the Wall Switch connected to
the line wire (identified in step 5). Using a ballpoint pen, put an "X"
in the box to indicate that this is the Secondary Switch.
30