Peterbilt 579 Operator's Manual page 341

Table of Contents

Advertisement

Every 60,000 miles or 6 months:
Refer to specific manufacturer's
literature for any special
instructions.
Remove fifth wheel from vehicle.
Refer to the Shop Manual, "Fifth
Wheel Removal."
Steam clean the fifth wheel and
mounting brackets.
Check all moving parts for
excessive wear or damage.
Replace all worn or broken parts.
Complete two-month service
procedure.
Install fifth wheel. Refer to
the Shop Manual, "Fifth Wheel
Installation."
(04/13)
Frame Fastener Torque
Requirements
Tighten all frame fasteners with a
torque wrench. Torque specifications
apply to the following fasteners with
lightly lubricated threads.
NOTE
Whenever possible, torque all frame
fasteners on the nut end, not the bolt
head.
Y53-6047–2C
Standard Grade 8 UNF or UNC and Metric
FASTENER
TORQUE *
SIZE
Nm
5/16
22-30
3/8
41-54
7/16
75-88
1/2
109-122
9/16
156-190
5/8
224-265
3/4
394-462
7/8
517-626
1
952-1,129
1-1/8
1,346-1,591
1-1/4
1,877-2,217
1,380-1,630
METRIC WITH NYLON INSERT NUTS
M5
8-12
M6
9-15
M8
23-31
M10
33-43
M12
75-101
M16
163-217
M20
352-460
* ESNA Style Lock Nut, with nylon insert.
Lubricate nylon insert nut lightly with SAE
20/30 oil.
FRAME
Lb-Ft
16-22
30-40
55-65
80-90
115-140
165-195
290-340
380-460
700-830
990-1,170
6-9
7-11
17-23
5
24-32
55-75
120-160
260-340
5-105

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

567

Table of Contents