Setup; Unfolding The Handle; Installing The Discharge Chute - Toro Power Clear 721 QZE Operator's Manual

Hide thumbs Also See for Power Clear 721 QZE:
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
1

Unfolding the Handle

No Parts Required
Procedure
1. Loosen the handle knobs, pull out the U-shaped handle
locks until you can move the handle freely, and rotate
the handle to the operating position
1. U-shaped handle lock (2)
2. Insert the end of the U-shaped handle lock into the
open hole in the handle and tighten the handle knobs
until they are snug
Note: The handle knobs contain nyloc nuts that
require more pressure to tighten fully to prevent the
handle from coming loose during operation.
Description
No parts required
Screw
Chute assembly
Discharge-chute handle
(Figure
4).
Figure 4
2. Handle knobs
(Figure
5).
Qty.
Unfold the handle.
3
1
Install the discharge chute.
1
Important: Ensure that you do not pinch or kink
the control cable
1. Control cable
4
Use
Figure 5
(Figure
6).
Figure 6

Advertisement

Table of Contents
loading

This manual is also suitable for:

38744

Table of Contents