Newco FC Series Installation & Operation Instructions

Advertisement

N E W C O
Installation/Operation Instructions For The FC Series Brewers

PLUMBER'S INSTALLATION INSTRUCTIONS

1)
Flush water line before installing brewer. Brewer should be connected to COLD WATER LINE for best
operation.
2)
Water pressure should be at least 20 lbs. For less than a 25 ft run, use 1/4" copper tubing and connect to 1/2"
or larger water line. For longer runs, use 3/8" copper tubing & connect to 1/2" or larger water line and provide
an adapter fitting for connection to the brewer.
3)
If installed with saddle valve, the valve should have a minimum of 1/8" port hole for up to 25 ft run, and 5/16"
port hole for over 25 ft runs.
4)
Connect incoming water line to the flow control attached to the elbow extending from the the back of the
brewer. Manufacturer recommends connecting to copper tubing.

INSTALLATION INSTRUCTIONS

WARNING:
- Read and follow installation instructions before plugging or wiring in machine to electrical circuit.
Warranty will be void if machine is connected to any voltage other than that specified on the name plate.
1)
Make sure that the On/Off switch located on the rear of the unit is turned off. This switch controls the tank
elements and will prevent their being damaged prior to the tank being filled.
2)
Plug or wire brewer to appropriate voltage circuit as indicated on serial tag. Turn lower warmer switch, or
power switch on dispenser models, to the on position to supply power to the control board. The tank will begin
to fill. The solenoid will shut off when the tank has filled. The brewer has a probe mounted on the tank lid.
E N T E R P R I S E S
Man P.N. 101970 Rev 20170214

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FC Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Newco FC Series

  • Page 1 N E W C O E N T E R P R I S E S Installation/Operation Instructions For The FC Series Brewers PLUMBER'S INSTALLATION INSTRUCTIONS Flush water line before installing brewer. Brewer should be connected to COLD WATER LINE for best operation.
  • Page 2 This probe is designed to sense the water level in the tank. Brewer lid must be on in order for the probe to sense water level. If not on brewer electronics will automatically go into its backup safety timer circuit and turn the fill solenoid off in approximately 7.23 minutes.
  • Page 3 WIRING DIAGRAMS...
  • Page 4 LIMITED, AT NEWCO’S SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND. In no event shall Newco be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.

Table of Contents