N E W C O
Installation/Operation Instructions For The FC Series Brewers
PLUMBER'S INSTALLATION INSTRUCTIONS
1)
Flush water line before installing brewer. Brewer should be connected to COLD WATER LINE for best
operation.
2)
Water pressure should be at least 20 lbs. For less than a 25 ft run, use 1/4" copper tubing and connect to 1/2"
or larger water line. For longer runs, use 3/8" copper tubing & connect to 1/2" or larger water line and provide
an adapter fitting for connection to the brewer.
3)
If installed with saddle valve, the valve should have a minimum of 1/8" port hole for up to 25 ft run, and 5/16"
port hole for over 25 ft runs.
4)
Connect incoming water line to the flow control attached to the elbow extending from the the back of the
brewer. Manufacturer recommends connecting to copper tubing.
INSTALLATION INSTRUCTIONS
WARNING:
- Read and follow installation instructions before plugging or wiring in machine to electrical circuit.
Warranty will be void if machine is connected to any voltage other than that specified on the name plate.
1)
Make sure that the On/Off switch located on the rear of the unit is turned off. This switch controls the tank
elements and will prevent their being damaged prior to the tank being filled.
2)
Plug or wire brewer to appropriate voltage circuit as indicated on serial tag. Turn lower warmer switch, or
power switch on dispenser models, to the on position to supply power to the control board. The tank will begin
to fill. The solenoid will shut off when the tank has filled. The brewer has a probe mounted on the tank lid.
E N T E R P R I S E S
Man P.N. 101970 Rev 20170214
Need help?
Do you have a question about the FC Series and is the answer not in the manual?
Questions and answers