Van Bulkhead Installation - Prochem EVEREST 650 Operating Instructions Manual

Everest 650 high pressure 1.001-145.0 everest 650 low pressure 1.001-146.0 everest 408 high pressure 1.001-151.0 everest 408 low pressure 1.001-152.0
Hide thumbs Also See for EVEREST 650:
Table of Contents

Advertisement

Installation

Van Bulkhead Installation

1. Select a location on the vehicle floor to drill the hole for the bulkhead adapter. This location should be situated
in a position that eliminates the possibility of fuel line contact by either the operator(s) or accessories during the
working hours or maintenance periods. Make certain that the supplied hoses will reach the location and work
with the configuration you choose.
2. Drill a 5/8" (.625) diameter hole through the vehicle floor at the installation point chosen for the bulkhead.
3. Install the 1/8 NPT bulkhead adapter by inserting the adapter and tightening the nut on the opposite side of the
van floor.
4. Install (1) 1/8P x 5/16 push-on hosebarb fitting on to the bulkhead (inside van).
5. Attach the 5/16" fuel hose from the console to the hosebarb fitting on the bulkhead. DO NOT USE HOSE
CLAMPS AT THIS CONNECTION.
FUEL HOSE FROM
FUEL PRESSURE REGULATOR
14
FUEL HOSE
TO CONSOLE
VEHICLE FLOOR
HOSE MOUNTING CLAMPS
USE AS NEEDED
86352170 EVEREST
HOSEBARB
LOCTITE
BULKHEAD ADAPTER
BULKHEAD GASKET
5/8" DIA HOLE
BULKHEAD GASKET
BULKHEAD NUT
HOSEBARB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Everest 408

Table of Contents