Folding Instructions - Mercury DINGHY 200 Manual

Table of Contents

Advertisement

4. Push in the valve stems on the side air chambers to release the air
pressure evenly on all chambers. Push in the valve stem and turn the
stem a quarter turn clockwise to lock the valve in the open position.

Folding Instructions

1. Deflate the boat and floor following the deflating instructions. Keep the air
valves open and the floor in‑place.
2. Remove the seat, oars, and any equipment.
3. Fold the deflated sides inward until the lifting handles or oar locks meet in
the middle.
4. Fold the boat transom inward and then fold in the two rear cones inward
over the transom.
5. Starting at the transom end, roll up the boat from the transom towards the
bow.
eng
MAINTENANCE
25
18181
18168

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dinghy 240Dinghy 270

Table of Contents