Agilent Technologies 5977B Series Operating Manual page 64

Msd
Hide thumbs Also See for 5977B Series:
Table of Contents

Advertisement

3
Intuvo 9000 GC Column Maintenance
11 Replace the gasket with a new gasket rated for the maximum column
12 Verify that all Intuvo gaskets in the flow path are rated for the maximum
13 Place the column's click and run connectors into the single column (right)
14 Insert the column's attached Intuvo SmartID Key into the lower USB
15 Secure the new column by rotating the 1 c tab of the 4 column clamps over
16 Verify that the column's click and run fittings sit flat against the gasket.
17 Loosely install the two compression bolts.
Use the Intuvo torque driver to tighten the compression bolt until you hear one click.
C A U T I O N
Over-tightening can damage the flow path, strip the fittings, and cause leaks.
18 Tighten the compression bolts until you hear a click from the Intuvo
19 Close the column door.
20 Install the bus door.
21 Close the GC front door.
64
temperature expected with your method. (See
GC Gasket"
on page 65.)
column temperature expected with your method. Replace any gaskets that
have a lower temperature rating with one that has a temperature rating
that is compatible with your method.
bus fitting. See the GC manual for installing 2 columns in the GC.
connection shown.
the column retaining ring using the Intuvo torque driver.
torque driver.
"To Replace an Intuvo 9000
5977B Series MSD Operating Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5975 msd5977 msd

Table of Contents