ACV BNE 2 Condens Installation, Operation And Maintenance Instructions

21.8 kw

Advertisement

Quick Links

EN
InstallatIon, operatIon and

maIntenance InstructIons

BNE 2 Condens
21.8 kW
664Y5900 • A

Advertisement

Table of Contents
loading

Summary of Contents for ACV BNE 2 Condens

  • Page 1: Maintenance Instructions

    InstallatIon, operatIon and maIntenance InstructIons BNE 2 Condens 21.8 kW 664Y5900 • A...
  • Page 2: Table Of Contents

    Table of ConTenTs General recommendations ..............4 User's GUide .....................5 Instructions for the end-user ........................5 appliance description ................6 technical characteristics ..............8 Electrical Characteristics ........................... 8 Dimensions ................................10 Combustion Characteristics .........................12 Hydraulic Characteristics ..........................13 Chimney Connection Characteristics ....................14 DHW Performance ...............................15 Maximum Operating Conditions ......................15 installation ..................16...
  • Page 3 Table of ConTenTs startinG Up ...................31 Tools required for starting up ........................31 Checks before starting up ..........................31 Filling the System ..............................32 Starting up the Boiler ............................33 Combustion adjustment ..........................33 maintenance ..................34 Safety Instructions for the Boiler Maintenance ................34 Periodic boiler maintenance tasks ......................35 Cleaning the burner and the heating body ..................36...
  • Page 4: General Recommendations

    GEnERal RECOMMEnDaTIOnS note This manual contains important information with respect to the installation, the starting up and the maintenance of the boiler. This manual must be provided to the user, who will read it carefully and keep it in a safe place. We accept no liability should any damage result from the failure to comply with the instructions contained in this technical manual.
  • Page 5: User's Guide

    USER'S GUIDE instrUctions for the end-User Essential recommendations for safety • Do not store any flammable or corrosive products, paint, solvents, salts, chloride products and other detergent products near the appliance. • This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless supervised or unless they have been given instruction concerning the use of the appliance by a person responsible for their safety.
  • Page 6: Appliance Description

    DESCRIPTIOn The BNE 2 Condens condensation fuel boiler is a heat generator for central heating, with a a built-in domestic hot water preparation tank. The DHW preparation tank can operate independently from the boiler thanks to a built-in heating element (2,4 kW).
  • Page 7 AppliAnce Description 664Y5900 • A...
  • Page 8: Technical Characteristics

    TECHnICal CHaRaCTERISTICS electrical characteristics Main electrical characteristics BnE 2 Condens Rated voltage Rated frequency Rated current with oil burner Rated current with electrical heating element Electrical consumption with oil burner Electrical consumption with electrical heating element 2496 IP Class IP30 Wiring diagram caption 1.
  • Page 9 Technical characTerisTics 664Y5900 • A...
  • Page 10: Dimensions

    Technical characTerisTics dimensions Boiler Dimensions BnE 2 Condens A = Width B = Height 1650 C = Depth Volume of the combustion chamber dm³ 42.3 Height Combustion chamber Width Depth Drained weight 296 mm 80 mm 51 mm 102 mm...
  • Page 11 Technical characTerisTics Boiler Clearance BnE 2 Condens Recommended Minimum A (mm) B (mm) 1000 C (mm) D (mm) E (mm) leave a clearance to access the condenser 664Y5900 • A...
  • Page 12: Combustion Characteristics

    Technical characTerisTics combUstion characteristics Main Characteristics BNE 2 Condens Fuel type EL fuel Max. input (PCI) 22.4 (80/60°C) 21.8 Output at 100% (50/30°C) 23.5 Efficiency at 30% load (EN 677) (80/60°C) 97.5 Efficiency at 100% (50/30°C) 103.5 Combustion efficiency at 100% 98.2...
  • Page 13: Hydraulic Characteristics

    Technical characTerisTics hydraUlic characteristics Main hydraulic characteristics BNE 2 Condens Water content of the boiler Primary circuit capacity Heating inlet/outlet connection (F) " DHW inlet/outlet connection (M) " 3/4” Max. service pressure of DHW circuit Max. service pressure of heating circuit Primary circuit water pressure drop (∆T = 20 K)
  • Page 14: Chimney Connection Characteristics

    Technical characTerisTics chimney connection characteristics Chimney characteristics BNE 2 Condens Connection type ∅ of boiler connection to the chimney min. ∅ of flue pipe L = maximum length of flue pipe ( ∅ 80 mm) Max. temp of flue gases °C...
  • Page 15: Dhw Performance

    Technical characTerisTics dhW performance Domestic Hot Water Performance BNE 2 Condens Operating conditions at 80°C Peak flow at 40 °C [∆T = 30 K] L/10’ Peak flow at 50 °C [∆T = 40 K] L/10’ Peak flow at 40 °C [∆T = 30 K] L/60’...
  • Page 16: Installation

    InSTallaTIOn packaGe contents The appliances are delivered assembled, tested and packaged separately. package 1 contents package 2 contents • One BnE 2 Condens boiler. • a BMR 33 blue flame oil burner. • Installation, Operation and Maintenance • Installation, Operation and Maintenance...
  • Page 17: How To Move The Boiler

    InstallatIon hoW to move the boiler Using a hand truck Use a means of transport adapted to the boiler weight. Minimum width of the door and the hall necessary to pass the boiler A = maximum boiler width B = maximum boiler length C = Door width D = Hall width Door height = std...
  • Page 18: Safety Instructions For The Installation

    InstallatIon safety instrUctions for the installation General remarks The connections (electrical, flue pipe, hydraulic) must be carried out in accordance with current standards and regulations in force. If the water drawing off point is far from the tank, installing an auxiliary DHW loop can allow to get hot water more quickly at all times.
  • Page 19 The upper hot water layer may then reach very high temperatures. ACV recommends using a pre-set thermostatic mixing valve in order to provide hot water at a maximum of 60°C. Water heated to wash clothes, dishes and for other uses can cause serious burns.
  • Page 20: Recommendations For The Prevention Of Corrosion And Scaling

    (on the boiler flow line) combined with a dirt separator (upstream of the boiler) must be installed according to the manufacturer's instructions. - aCV recommends using additives that keep the oxygen in solution in the water, such as Fernox (www.fernox.com) and Sentinel (www.sentinel-solutions.net) products.
  • Page 21 InstallatIon 4. Limit the carbonate concentration in the water - The fill water must be softened if its hardness is higher than 20° fH (11,2° dH). - Check regularly the water hardness and enter the values in the service log. - Water hardness table : Water hardness °fH...
  • Page 22: Boiler Preparation

    InstallatIon boiler preparation 664Y5900 • A...
  • Page 23 InstallatIon 664Y5900 • A...
  • Page 24: Burner Installation

    InstallatIon bUrner installation 664Y5900 • A...
  • Page 25 InstallatIon 664Y5900 • A...
  • Page 26: Electrical Connections

    InstallatIon electrical connections Description Heating pump of the system Room thermostat Bridge (to be removed before connecting the room thermostat) 230 V ~ 50HZ 664Y5900 • A...
  • Page 27: Flue Connection

    InstallatIon flUe connection Operation related to the ambiant air (Type B23 Installation) To ventilate the boiler room, it is required to install- in accordance with combustion regulations - a fresh air inlet of at least 150 cm or to provide a connection with other rooms to ensure a fresh air supply.
  • Page 28: Heating Circuit Connection

    InstallatIon heatinG circUit connection 1. Heating circuit isolating valve Do not install thermostatic valves on 2. Check valve the radiators located in rooms fitted 3. Heating pump of the system with a room thermostat. 4. Mixing valve 5. Safety group 6.
  • Page 29: Dhw Connection

    InstallatIon dhW connection Essential recommendation for safety The hot water output may reach temperatures in excess of 60°C, which can cause scalding! It is therefore necessary to install a thermostatic mixing valve after the appliance. Essential recommendations for the correct operation of the appliance Flush the system before connecting the domestic hot water circuit.
  • Page 30: Oil Connection

    InstallatIon oil connection General remarks The oil connection must comply with all applicable standards. Essential recommendations for safety Refer to the technical characteristics and safety instructions of the burner technical manual. Failure to comply with the instructions could result in damage to the material, personal injury or death.
  • Page 31: Starting Up

    STaRTInG UP safety instrUctions for startinG Up General remark In normal operation, the burner starts automatically as soon as the boiler temperature drops below the preset temperature. Essential recommendations for safety The components inside the control panel can only be accessed by an approved installer.
  • Page 32: Filling The System

    Starting up fillinG the system First put the DHW tank under pressure before pressurizing the heating (primary) circuit. Filling the domestic hot water circuit Open the isolating valves (1) and the drawoff tap (2). Once the water flow rate has stabi- lized and the air is totally evacuated from the system, close the draw-off tap (2).
  • Page 33: Starting Up The Boiler

    Starting up startinG Up the boiler Set-up conditions • all connections made • External power supply enabled • Oil supply open • DHW and heating circuits full of water Procedure Put the On/OFF master switch to On Rotate the boiler control thermostat clockwise to generate a heat demand. Possibly increase the set temperature of the room thermostat, if installed.
  • Page 34: Maintenance

    MaInTEnanCE safety instrUctions for the boiler maintenance Essential recommendation for the electrical safety Isolate the external power supply of the appliance before performing any operation, unless it is required to take measurements or perform system setup. Essential recommendations for safety Water flowing out of the drain valve may be extremely hot and could cause severe scalding.
  • Page 35: Periodic Boiler Maintenance Tasks

    Maintenance periodic boiler maintenance tasks Frequency Tasks Periodic inspection year years End-user Professional Make sure that the system water pressure is at least 1 bar when cold. Top up the system if necessary, adding small quantities of water at a time. In case of repeated fills, call your installer.
  • Page 36: Cleaning The Burner And The Heating Body

    Maintenance It is recommended to stop the boiler and have it serviced during good weather conditions. cleaninG the bUrner and the heatinG body Set-up conditions • Boiler shut-down • External power supply isolated • Oil supply closed Procedure 1. Open the front panel. 2.
  • Page 37: Cleaning The Condensate Trap

    Maintenance Follow-on tasks 1. Close the condenser and the rear panels, and reconnect theflue pipe. cleaninG the condensate trap Set-up conditions • Boiler shut-down • External power supply isolated • Oil supply closed Procedure 1. Release the condensate trap ring. 2.
  • Page 38: Draining The Boiler

    Maintenance draininG the boiler Before draining the DHW tank, drain the heating (primary) circuit or bring its pressure to 0 bar. Water flowing out of the drain valve may be extremely hot and could cause severe scalding. Keep people away from the hot water discharge. Set-up conditions •...
  • Page 39: Restart After Maintenance

    The part number (Code) and serial number (N°) of the appliance are written on the type plate and must be provided to ACV in the case of a warranty claim.. If they are not provided, the warranty claim shall be void.
  • Page 40: Declaration Of Conformity - Ec

    DEClaRaTIOn OF COnFORMITy - EC 664Y5900 • A...
  • Page 41: Declaration Of Conformity - Rd 17/7/2009

    DEClaRaTIOn OF COnFORMITy - RD 17/7/2009 664Y5900 • A...
  • Page 42 markinGs labels Pending approval 664Y5900 • A...

Table of Contents