Trane GEHE 072-180 Installation, Operation And Maintenance Manual page 14

Water source heat pump axiom horizontal/vertical geh/v series exh/v series
Table of Contents

Advertisement

Unit Dimensions
Figure 3.
Clearance - GEV .5 to 5 tons & EXV .5 to 6 Tons
24"
UNIT FRONT
RIGHT
RETURN
36"
TOP/BACK
SUPPLY
1"
UNIT FRONT
36"
Figure 4.
Clearance - GEV 6 to 10 Tons
24"
ACCESS PANEL FOR
SHEAVES AND BELTS
Figure 5.
Clearance - GEV 12.5 to 25 Tons
24"
FRONT RETURN-AIR
BACK SUPPLY-AIR
CONTROL BOX
36"
14
1"
24"
LEFT
RETURN
TOP/BACK
SUPPLY
FRONT RETURN
TOP SUPPLY
24"
36"
18"
24"
UNIT FRONT
18"
A 24 inch clearance from other mechanical and electrical
equipment (where shown) is recommended for all
configurations.This will enable panel removal from the
unit for service/maintenance.
A 1 inch minimum clearance between the filter rack and any
obstacle is required for units in a free return application to
provide proper air flow to the air-to-refrigerant coil. A 12
inch minimum clearance between the filter rack and any
obstacle should be provided to properly attached
ductwork.
The 1 inch dimension shown in the back of the unit
represents the supply duct collar for the back supply
option.This clearance is needed to clear these flanges.
A 24 inch clearance from other mechanical and electrical
equipment (where shown) is recommended for all
configurations.The unit may be serviced through the front
access panel or remaining open sides.
A 24 inch clearance from other mechanical and electrical
equipment (where shown) is recommended for all
configurations.The unit may be serviced through the front
access panel.
WSHP-SVX01Q-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents