Installation - OHAUS CKW3R Instruction Manual

Ckw base
Hide thumbs Also See for CKW3R:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
EN-2

2. INSTALLATION

2.1 Unpacking
Unpack and inspect the product to make sure that all components have been included. The CKW Base package
includes the following:
CKW Base
Weighing Pan
When purchased as a complete CKW scale, will also include:
CKW-55 Indicator
Check to ensure the product was not damaged during shipping. Immediately inform your OHAUS dealer in the
unlikely event that you find damaged or missing parts.
Save the packaging material. Re-pack the product using original packaging materials to ensure safe storage or
transport.
2.2 Assembly
2.2.1 Weighing Pan
Place the weighing pan securely over the rubber load pads on the top plate of the base (first ensure that all load
pads are seated fully in their respective mounting holes).
2.2.2 Wiring Connections
Connect the load cell cable to an indicator using the wiring codes in Tables 2-1 and 2-2 below. Refer to the
indicator manual for information about load cell connections, setup and calibration.
Note: When purchased as a CKW scale, the base is already pre-wired to the CKW-55 Indicator.
TABLE 2-1. FOUR WIRE LOAD CELL CONNECTION
(CKW3R, 6R and 15L)
Function
+ Excitation
- Excitation
+ Signal
- Signal
Warranty Card
Column Assembly
Wire Color
Green
Black
Red
White
Instruction Manual
TABLE 2-2. SIX WIRE LOAD CELL CONNECTION
Function
+ Excitation
- Excitation
+ Signal
- Signal
+ Sense
- Sense
Shield
CHECKWEIGH BASE
(CKW30L only)
Wire Color
Green
Black
Red
White
Blue
Brown
Yellow

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ckw6rCkw15lCkw30l

Table of Contents