Installation / Performance Checklist - Maytag iQ Drive R6GI Installation Instructions Manual

Multi-stage, variable speed, inverter driven system with gas heating / electric cooling
Table of Contents

Advertisement

It is your responsibility to know this product better than your customer. This includes being able to install the product according to strict safety
guidelines and instructing the customer on how to operate and maintain the equipment for the life of the product. Safety should always be the
deciding factor when installing this product and using common sense plays an important role as well. Pay attention to all safety warnings and any
other special notes highlighted in the manual. Improper installation of the unit or failure to follow safety warnings could result in serious injury,
death, or property damage. These instructions are primarily intended to assist qualified individuals experienced in the proper installation of this
appliance. Some local codes require licensed installation/service personnel for this type of equipment. After completing the installation, return
these instructions to the customer's package for future reference.
INSTALLATION ADDRESS:
CITY ________________________
UNIT MODEL # ________________________________________
UNIT SERIAL # _______________________________________
Unit Installed Minimum clearances per
Figure 1 (page 5)?
INSTALLER NAME:
CITY _______________________
Has the owner's information been
reviewed with the customer?
Has the Literature Package been left
with the unit?
ELECTRICAL SYSTEM
Electrical connections tight?
Line voltage polarity correct?
Rated Voltage: ___________________________________ VOLTS
L1-L2 Volts: _____________________________________ VOLTS
Has the thermostat been calibrated?
Is the thermostat level?
Is the heat anticipator setting correct?
VENTING SYSTEM
Is the vent hood installed?
Is vent hood free from restrictions
Filter(s) secured in place?
Filter(s) clean?
Specifications & illustrations subject to change without notice or incurring obligations.
O' Fallon, MO | Printed in U.S.A. (07/12)
INSTALLATION / PERFORMANCE CHECK LIST
ATTENTION INSTALLERS:
STATE ________________
YES
NO
STATE ________________
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
GAS SYSTEM
Gas Type: (circle one)
Gas pipe connections leak-tested?
Gas Line Pressure: ____________________________ (in - W.C.)
Is there adequate fresh air supply
for combustion and ventilation?
Installation Altitude: ______________________________ (FT.)
Deration Percentage: ______________________________ (%)
Furnace Input: _________________________________(Btuh)
Supply Air Temperature: __________________________ (° F)
Return Air Temperature: __________________________ (° F)
Temperature Rise: _______________________________ (° F)
During Furnace Operation:
Low fire manifold pressure: ______________________ (in - W.C.)
High fire manifold pressure: ______________________ (in - W.C.)
REFRIGERATION SYSTEM
Liquid Pressure @ Nominal Speed (high side) ________________
Suction Pressure @ Nominal Speed (low side) ________________
Natural
Propane
Gas
YES
NO
YES
NO
709225A (Replaces 7092250)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq drive ppg2gi

Table of Contents