Sharp DV-NC55U Service Manual page 35

Vcr/dvd combination model
Hide thumbs Also See for DV-NC55U:
Table of Contents

Advertisement

8-26. INSTALLING THE SHIFTER
Capstan
D.D. motor
Reel pulley
(Bottom side of mechanism chassis)
Figure 8-43.
Drum
Insert
point 3
Insert
point 2
Rotation
point 2
Shaft 1
Phase-matching
point 1
Figure 8-44.
1. Make sure that the loading gear is at the Phase-Match-
ing point 1 as shown below.
2. Install, paying attention to insert point 5 and release
point 3.
3. For the phase matching at the insert point 1, see the
Phase-Matching point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Phase-Matching
point 2
Loading gear (T)
Round mark
Sifter
Half round notch
Insert
point 4
Shaft 1
Shaft 4
Release
point 3
35
Insert
point 1
Shaft 1
Insert
point 5
DV-NC55U/C/M

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv-nc55mDv-nc55c

Table of Contents