Pressure Adjustment; Assembly - Chicago Pneumatic RX 2 Safety And Operating Instructions Manual

Hydraulic breakers
Table of Contents

Advertisement

Safety and operating instructions
Viscosity
Viscosity (permitted)
NOTICE
Always use clean oil and filling
equipment.

Pressure adjustment

To ensure that the accumulator and hammer are not
overloaded, a separate pressure relief valve should
be installed, see picture below. It is set at a value of
30 bar over the hammer s maximum operating
pressure. If the carrier s breaker circuit is already
equipped with a pressure limiting valve, no extra
valve is necessary.
P
M

Assembly

WARNING
Falling breaker can cause
injuries
Place the breaker in a safe position where it can
not fall over and cause damage.
14
15-100 cSt
P
T
T
Preparation
1. Place the breaker in a position where it is easy
and safe to mount the adapter plate.
Mounting the adapter plate
2. Place a locking washer pair on each screw.
3. Tighten the screws with an spanner.
4. Always use NORDLOCK™ washers under bolt
and nut (NORDLOCK™ is a registered trademark
of Nord-Lock AB).
5.
Adapter plate
RX 2
RX 3
RX 4
RX 6
RX 8
Connecting the breaker to the carrier
6. Place the breaker in a safe way at installation.
9800 1050 01f | Original instructions
RX 2, 3, 4, 6, 8
Tightening torque
200 Nm
200 Nm
390 Nm
390 Nm
390 Nm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rx 4Rx 3Rx 6Rx 8

Table of Contents