Troubleshooting By Symptom (Base Unit And Charger Unit) - Panasonic KX-TG5521RUB Service Manual

Digital cordless answering system
Table of Contents

Advertisement

KX-TG5521RUB/KX-TGA551RUB
9.2.

Troubleshooting by Symptom (Base Unit and Charger Unit)

If your unit has below symptoms, follow the instructions in remedy column. Remedies depend on whether you have DECT tester
(*1) or not.
Symptom
You cannot dial.
You cannot hear the caller's voice.
You cannot use handset a little away from base unit
even if the handset is within range of the base unit.
The acoustic transmit level is high or low.
The acoustic reception level is high or low.
Base unit and handset do not link each other.
The unit cannot charge.
TAM does not work.
Note:
(*1) A general repair is possible even if you don't have the DECT tester because it is for confirming the levels, such as Acoustic
level in detail.
(*2) Refer to Check Point (Base Unit) (P.36)
9.2.1.
Check Point (Base Unit)
Please follow the items below when BBIC or EEPROM or FLASH is replaced.
Note:
After the measuring, suck up the solder of TP.
*: The Setting Method of JIG (Base Unit) (P.49) is required beforehand.
The connections of simulator equipment are as shown in Adjustment Standard (Base Unit) (P.51).
Items
(A) 3.0 V Supply Confirma-
tion
(B) 1.8 V Supply Confirma-
tion
(C) Charge Pump
2.5V Supply Confirma-
tion
(D) Charge Pump
3.0V Supply Confirma-
tion
(E)*
BBIC Confirmation
(F)* EEPROM Confirmation
(G)* BBIC Clock Adjustment
Check
Point
VDD3
1. Confirm that the voltage between test point VDD3 and GND is 3.0 V ± 0.2 V.
VDD1
1. Confirm that the voltage between test point VDD1 and GND is 1.8 V ± 0.02 V.
2. Execute the command "VDD", then check the current value.
3. Adjust the 1.8V voltage of VDD1 executing command "VDD XX"(XX is the
value).
VDD5
1. Confirm that the voltage between test point VDD5 and GND is 2.5 V ± 0.3 V.
VDD4
1. Confirm that the voltage between test point VDD4 and GND is 3.0 V ± 0.2 V.
-
1. BBIC Confirmation (Execute the command "getchk").
2. Confirm the returned checksum value.
Connection of checksum value and program number is shown below.
ex.)
-
1. EEP-ROM Confirmation (Execute the command "sendchar EPV").
2. Confirm the returned Value. (Value for reference is written at "EEPROM C/
SUM" in Software_Version_Table.xls).
CLK
1. Input Command " sendchar WWD ff 48 IC 8006"
2. Confirm that the voltage between testpoint VDD4 and GND is less than 1.0 V.
3. Input Command " sendchar sfr", then you can confirm the current value.
4. Check X'tal Frequency. (10.368 MHz ± 100 Hz).
5. If the frequency is not 10.368MHz ± 100Hz, adjust the frequency of CLK exe-
cuting the command "sendchar sfr xx xx (where xx is the value)" so that the
reading of the frequency counter is 10.368000 MHz ± 5 Hz.
You don't have DECT Tester.
Check item (A)-(I),(T).
Check item (A)-(G),(Q),(T).
-
Check item (Q).
Check item (Q).
Check item (A)-(I).
Check item (R).
Check item (S).
Procedure
checksum value
program number
53F5
DBR1EN
36
Remedy (*2)
You have DECT Tester.
(Model Number : CMD60)
Check item (A)-(I), (J)-(P),(T).
Check item (A)-(G), (J)-(P), (Q),(T).
Check item (J)-(P).
Check item (Q).
Check item (Q).
Check item (A)-(P).
Check item (R).
Check item (S).
Replace Parts
IC2, IC3, C32,
C36, C86, C87,
C88, R91, R92,
R93, R95, D10,
Q8, C75, C614,
IC7,C625,C631
IC7,C616,C630
IC7, X1, R77,
IC7, RA402,
C51, R657,
X1, IC7, R430,
Check or
Q10, L3
C61, IC7
RA80
IC401
C305

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kx-tga551rub

Table of Contents