Opening The Unit; Assembling Of The Burner - geminox FCX 22 C Technical Instructions

Boiler water capacity up to 25l
Hide thumbs Also See for FCX 22 C:
Table of Contents

Advertisement

3 - OPENING THE UNIT

To open Model FCX to access for installation, and/
or service, follow these steps :
- Remove the control panel escutcheon molding
(6) by grasping it on both sides and pulling it ou-
tward towards you and up. The escutcheon will
come free of the attachment clips leaving the
control panel exposed.
- Remove the top cover of the unit (A) by lifting the
cover at the front and rear to free the attachment
clips, and then simply lift the cover straight up and
off.
- Remove the front panel attachment screws (P),
then pull the front panel (J) outward towards you
at the top to free it from the attachment clips. Lift
the panel up to free it from the lower attachment
pins, and simply lift the panel off.

4 - ASSEMBLING OF THE BURNER

- Remove the front panel attachment screws (P,
fig. 6), then pull the front panel (J, fig. 6) outward
towards you at the top to free it from the attach-
ment clips. Lift the panel up to free it from the
lower attachment pins, and simply lift the panel
off.
- Make the assembly of the burner on the boiler -
refer to the burner's technical instructions.
- After the assembly of the burner :
• connect the air inlet pipe (21, fig. 7) to the bur-
ner (11, fig. 7) and fix it with the fastening
collar (1, fig. 7) supplied to avoid any risks
of disconnection (A disconnection of the
burner air inlet pipe could generate a dys-
function of the burner),
• carry out the power supply connection to the
burner with the connector (37, fig. 7) located in
the boiler
Fig. 6
6
P
Fig. 7
21
21
- remount the front panel (J, fig. 4) with the 2
screws (P, fig. 4), after starting-up the boiler and
after checking the combustion settings
- 14 -
INSTALLATION
A
J
11
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcx 30 c

Table of Contents