CE Declaration This device can be built into an existing or new chimney. Glen Dimplex Benelux certifies that this Faber fire complies with the essential requirements of the For devices with flexible gas pipes the gas gas appliances directive.
Installation instructions 4 Preparation and installation construction with proper insulation and protection. And ensure respective instructions distance. Ensure for great discharge lengths that Gas connection the concentric discharge material is supported every meter, so that the weight The gas connection must comply with the of the material is not supported by the applicable local standards.
Page 9
Installation instructions These mounting materials are exclusively intended For installation and finishing the following points for use on walls constructed of brick or concrete. are of interest: For walls built of other materials, such as hollow bricks, consult a professional expert. A = Fixing points (Fig.
Installation instructions Glow wire Remove the bottom strip (Q) using the supplied magnetic knob (R, Fig. 3.3). The “glow wire” gives a decorative glow effect. 5 Removing the glass Pull the wool well apart and place tufts in different places on the burner. 5.1 removing the front glass ...
Installation instructions CO2 is 4% and CO is 400ppm, measured at the Take this measurement at highest setting highest point of the fire and when the fire is set to pilot light. If the ratio is greater than 1:100 or exhaust gases Do not connect the unit if the pressure is are measured in the supply air, then also check too high.
Page 12
Elbows 90° vertical to horizontal plane configuration is possible in combination with your These are 90° elbows, which proceed from fire, use the free “Faber Flue App” and download horizontal to vertical (Fig. 12.2 and 12.3 G, O and S) from: ...
Installation instructions 14 Technical data II2H3+ II2H3+ II2H3+ Gascat. Type appliance C11 C31 C11 C31 C11 C31 Reference gas 10.5 10.5 10,5 Input Nett Efficiency class NOx class mbar inlet-pressure 1082 Gas rate at 15ºC and 1013 mbar gr/h Gas rate at 15ºC and 1013 mbar mbar Burner pressure at full mark 2x St510...
Installation instructions 15 Terminal position Please note: These rules apply only for the proper functioning of the unit, for ventilation and environmental protection you need to comply with the applicable rules as defined in the building regulations. Short roof terminal Only for existing Chimney connection Extension pipe over roof...
Need help?
Do you have a question about the triple premium l and is the answer not in the manual?
Questions and answers