Pre-Installation Checklist; Fixing Kit - Envirovent PIV Installation And User Manual

Loft mounted unit
Hide thumbs Also See for PIV:
Table of Contents

Advertisement

PRE-INSTALLATION CHECKLIST

Check that the loft has adequate cross
flow ventilation.
Check that all party walls are intact, seek
advice if the wall is missing or broken.
Check that any flue which passes through
the loft is not damaged, seek advice if the
flue is in a poor state of repair.
Check for any flued appliance which may
draw air from the loft, report to the client.
Check for any holes in the ceilings which
may allow leakage of air to the loft and
repair as appropriate.
Check that the water storage tank is
covered.
PIV & MIV

FIXING KIT

Description
8 X FOAM PADS
4 X PENNY
WASHERS
4 X PLASTER
BOARD PLUGS
4 X WOOD
SCREWS (10 X 1.5)
4 X WOOD
SCREWS (10 X 3)
4 X WOOD
SCREWS (8 X 1)
4 X WOOD
SCREWS (8 X 1.5)
ROLL OF
INSULATION TAPE
Loft Mounted Unit
®
Item
02

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PIV and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Miv

Table of Contents

Save PDF