Head Plate - ParaBody 425104 Assembly Instructions Manual

Parabody home gym assembly instructions
Table of Contents

Advertisement

STEP 52
• If upon completion of assembly, the HEAD PLATE (72) does not
sit on top of the first WEIGHT PLATE (105), push the HEAD
PLATE (72) down, insert the WEIGHT STACK PIN (75) and
perform several repetitions at the press station. This will relax the
cable system and prevent the HEAD PLATE (72) from lifting up.
• If after completing previous step, the HEAD PLATE (72) still does
not sit on top of the first WEIGHT PLATE (105) or if there is
excess slack in the cable system, adjust the two threaded ends of
the HEAD PLATE CABLE (102) accordingly and retighten the jam
nuts.
• If there is excess slack in the AB or PEC DEC cable system, adjust
the threaded end of the AB CABLE (103) accordingly and re-
tighten the jam nut.
FIGURE 53
STEP 53
• Apply pressure to the bottom of one SHROUD (31) where thw "V" groove is and carefuly remove the weight stack opening on the plastic
SHROUD (31) as shown in FIGURE 53. This will be the front SHROUD (31).
• Apply one PARABODY 425 SERIOUS STEEL LABEL (32) to the front SHROUD (31) approximately 6-1/2" from the top as shown in FIGURE
53.
6-1/2"
32
31
105
75
FIGURE 52
31
44
102
72

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Serious steel 425104

Table of Contents