Site Preparation - Follett Horizon HMD700NHT Installation Instructions Manual

Table of Contents

Advertisement

Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation of
low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
• 120/60/1-6 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Water supply must be treated by a scale-inhibiting fi lter (item# 00130286)
Drain
• The drain line from the ice machine must be vented and have at least 1/4" per foot pitch
(6,4mm/0,3m)
Refrigeration lines
• 5/8" (15,8mm) diameter suction (insulated)
• 3/8" (9,5mm) liquid
HARMONY • TOP-MOUNT
1'
1/4"
remote condensing
3/8" ∅ (9,5mm)

Site preparation

NEMA
5-15
2
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Horizon hcd700nhtHorizon hmd700rhtHorizon hcd700rht

Table of Contents