Allied Air A97USMV Installation Instructions Manual page 45

Warm air gas furnace
Table of Contents

Advertisement

Single Stage
DIP Switch Settings & On Board Links (Figure 41)
Thermostat
DIP Switch
(Y1 to Y2)
Two Stage
Dual Fuel
Single Stage
Heat Pump
thermostat
w/dual fuel
DIP Switch 1
capabilities
OFF
Capable of
2 stage gas
heat con-
trol
507028-03
Low Voltage Field Wiring
W915
W914
(DS to R)
(O to R)
Dehumidifica-
Heat Pumps
Cooling
tion
Intact
Intact
Thermostat
W951
Dual Fuel
Two Stage
Heat Pump
thermostat
w/dual fuel
Cut
capabilities
Capable of
2 stage gas
heat con-
trol
Table 14
Issue 1622
2 Stage
DIP Switch Settings & On Board Links (Figure 41)
DIP Switch
W915
W914
(Y1 to Y2)
(DS to R)
Two Stage
Dehumidifica-
Cooling
tion
DIP Switch 1
Cut
OFF
W951
(O to R)
Heat Pumps
Intact
Cut
Page 45 of 74

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents