Quadra-Fire 43M-ACC-MBK Installation Manual page 19

4300 wood appliance series
Hide thumbs Also See for 43M-ACC-MBK:
Table of Contents

Advertisement

Figure 19.1
Door latch with the
ash door rod locked
in place
Figure 19.2
Insert two bolts through ARS
Channel, Appliance, Gasket, and
ARS Door Assembly; secure with
two nuts.
Figure 19.3
September 26, 2016
Knob
Ash Door Rod shown
in installed position
4300 Wood Appliance Series ACC
Ash Removal
Spacer
Figure 19.4
Ped Kit and Ash Removal System (Cont'd)
Installing Ped Kit
1. Follow
Begin installing the ARS System
page 18.
2. Slide pedestal over adapter on bottom of appliance and secure
with bolts from heat shield (Figure 20.1 on page 20).
3. Install ARS Spacer on left hand side with one bolt using phillips
head screwdriver (Figure 19.4).
4. Carefully stand stove up and place in desired location.
Finishing the ARS Installation
1. Replace front bricks that were removed in step 1 of Begin
installing the ARS System on page 17 (Figure 20.2 on page
20).
2. Install the ash drawer to pedestal base.
3. Install ARS access cover inside of ARS Channel that is located
inside the firebox (Figure 20.2 on page 20).
Caution!
CHECK BAFFLE BOARDS & CERAMIC BLANKET!
Verify that the baffle boards and ceramic blanket are
in their proper locations.
It is important that the baffle boards and ceramic
blanket are correctly installed for proper burn safety.
NOTE: If installing a floor installation of an outside air kit on a Step
Top model with a pedestal assembly you must attach the enclosed
cover plate with 4 screw to the back of the stove. Other wise you
may discard this piece (Figure 20.3 on page 20).
7037-172
instructions provided on
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

43st-acc-b

Table of Contents