Install The Indoor Unit - GE AIR 116 IN Service Manual & Installation Manual

Split system air conditioner
Table of Contents

Advertisement

11.2

Install the Indoor Unit

1
install the wall mounted frame
Measure horizon position by hanging line method.
The left side is a little bit lower when adjusting
the hang plate since the drainage hose outlet is
at the left side.
Fix rear plate on wall by bolts.
Pull the rear panel after installation to see if it is
firm enough. The rear panel afterinstalled should
be able to stand the weight of an adult (60kg),
and the weight should beevenly shared on each
screw.
2 Install the piping hole
As shown in fig.11-2, pipe can go out from 6
directions, choose one in necessary.
As shown in fig. 11-1, after deciding the loca-
tion of piping hole, and drill a hole withdownward
slant (Diameter 55) .
In order to protect pipe and cable from damage
when going through the wall, install piping hole
sleeve.
3 Install Drainage Hose
Drainage hose must be placed at a downward slant
for smooth drainage
Do not wrench, bend or heave the drain hose or
flood its end into water (as shown in fig. 11-3)
Heat insulation material should be wrapped on the
elongated drainage hose whenpassing through the
indoor unit.
4
Install connect pipe
Connect the connecting pipe with the 2 leading pipes from indoor unit correspondingly, and tighten joint nuts on
connecting pipe (refer to the"Installation of connecting pipes" in the later section)
Notes:
Connect the connecting pipe with indoor unit first, and then outdoor unit
Be careful when bending connecting pipe, avoid damaging it
Don't tighten the joint nut too much, or leakage would occur
Rear Left Piping
Right
Rear Right
Low Right
Convex
30
Rear Right Piping
Fig.11-1
Rear Left
Low Left
Fig.11-2
Wrenched
Flood into water
Fig.11-3
Left

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Air 116 outAir 121 inAir 121 out

Table of Contents