Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Commissioning steps
Inspection steps
Maintenance steps
1. Checking the high limit safety cut-out setting.............
2. Filling the heating system with water and venting the
system.............................................................................
3. Filling the siphon with water.........................................
4. Commissioning the system...........................................
6. Converting to natural gas LL.........................................
8. Checking the CO
9. Checking the CO content
10. Checking the flue gas temperature
13. Opening the boiler door................................................. 20
14. Separating the neutralising system (if installed) from
the boiler and connecting the drain hose.................... 20
15. Cleaning the combustion chamber and heating
surfaces........................................................................... 20
17. Checking all connections on the heating water side
18. Cleaning and reconnecting the condensate drain
system............................................................................. 22
19. Checking the condensate drain and the neutralising
Commissioning, inspection, maintenance
content............................................. 14