Commissioning, inspection, maintenance
Further details regarding the individual steps
Checking the static and the supply pressure
Static pressure
87 kW
12
115 to 311 kW
A
1. Close the gas shut-off valve.
2. Undo the screw in test nipple A, but
do not remove.
3. Connect the pressure tester at test
nipple A.
4. Open the gas shut-off valve.
5. Check the static pressure (max.
60 mbar).
6. Record the actual value in the report
(on page 61).
(cont.)