Electrics - Worcester greenstar camray 12/18 Instruction Manual

Floor standing oil fired condensing boiler conventional flue & room sealed flue
Hide thumbs Also See for greenstar camray 12/18:
Table of Contents

Advertisement

A
1
230V
2
G
E
F
G
3
230V
1 2 3
230V
1 2 3
27

ELECTRICS

C
B
A
D
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32
ELECTRICS
DANGER - 230V:
ISOLATE THE MAINS ELECTRICITY
= EARTH
SUPPLY BEFORE STARTING ANY
= LIVE
WORK AND OBSERVE ALL RELEVANT
= NEUTRAL
SAFETY PRECAUTIONS.
= SWITCHED LIVE
Access to 230V connections:
1 Release screws (A) and remove front
panel (B) from control box (C).
2 Release screws (D) from cable clamp (E).
Pull inner clamp part (F) outwards.
Feed sufficient power cable (G) through the
cable clamp (E) and secure grip with
screws (D).
Separate wires from cable end and strip to 6mm.
230V connections:
3 Connect LIVE wire (Brown) to
terminal L.
Connect NEUTRAL wire (Blue) to
terminal N.
Connect EARTH wire (Green/Yellow) to
the terminal
Route the power cable down the side panel
using the clip provided on the support panel
to the external connection point avoiding any
potentially hot surfaces allowing sufficient
cable to open the control box.
Any external device connected to the
system must take its power supply
from the boiler supply only and must
NOT have a separate supply.
See the following pages of electrical
diagrams for details of different systems.
Refit electric control panel cover:
Refit front panel (B) to control box (C) and
secure with screws (A).
.
8 716 113 004b (05.07)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar camray 18/25Greenstar camray 25/32

Table of Contents