Data displayed in menu item LOG:
(for the current day, the current calendar year, and since using the inverter for the first
time)
AC Energy Yield (kWh / MWh)
Due to the variety of different monitoring systems, there can be deviations between the
readings of other metering instruments and the readings from the inverter. For determin-
ing the energy supplied to the grid, only the readings of the calibrated meter supplied by
the electric utility company are relevant.
AC Maximum output power (W)
Earnings
Setup menu)
As was the case for the output energy, readings may differ from those of other instru-
ments.
"The Setup Menu" section describes how to set the currency and rate for the energy sup-
plied.
The factory setting depends on the respective country-specific setup.
CO2 savings (g / kg)
CO
The value for CO
CO
factory setting is 0.53 kg / kWh (source: DGS – Deutsche Gesellschaft für Sonnenenergie
e.V. (German Society for Solar Energy).
AC Max. Voltage L-N (V)
highest reading of voltage between the conductor and neutral conductor during monitored
period
PV Array Max. Voltage (V)
Operating Hours
IMPORTANT! The time must be set correctly for day and year values to be displayed
properly.
20
energy fed into the grid during the monitored period
highest power feeding in during the monitored period
amount of money earned during the monitored period (currency can be selected in the
emissions saved during the period in question
2
savings depends on the power station facilities and corresponds to the
2
emissions that would be released when generating the same amount of energy. The
2
highest reading of solar module voltage during monitored period
indicates how long the inverter has been operating (HH:MM)