EBARA DLFU Instruction Manual page 5

Table of Contents

Advertisement

EBARA Submersible Sewage Pumps
Instruction Manual
Installation
3. Electrical Wiring:
Check that the power is locked off and disconnected before working on pump. All electrical work should be
performed by a qualified electrician and all national and local electrical codes must be observed.
(1) Wiring
a) Wire as indicated for the appropriate start system as shown in Fig. 3.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.
Output 2 to 10HP
208/230V
G
L 1 – RED – T 1 – T 7
L 2 – WHT – T 2 – T 8
L 3 – BLK – T 3 – T 9
T 4 – T 5 – T 6 – T 10 – T 11 – T 12
P 1 – RED
P 2 – WHT
P 3 – BLK
P 4 – OR
G – GRN
Output 15 to 30HP
208/230V
G
– GRN
L
– RED – T
1
L
– WHT – T
2
L
– BLK – T
3
P
– RED
1
P
– WHT
2
P
– BLK
3
P
– ORG
4
G – GRN
Output 40 to 60HP
208/230V
G
– GRN
L 1 – RED – T 1 – T 7
L 2 – WHT – T 2 – T 8
L 3 – BLK – T 3 – T 9
L 5 – WHT – T 4 – T 10
L 6 – BLK – T 5 – T 11
L 4 – RED – T 6 – T 12
P 1 – RED
P 2 – WHT
P 3 – BLK
P 4 – ORG
G – GRN
EBARA International Corporation
Standard Pump Division
(t) 803 327 5005 • (f) 803 327 5097 •
– GRN
– T
– T
– T
1
7
6
12
– T
– T
– T
4
8
2
10
– T
– T
– T
3
9
5
11
info@pumpsebara.com
WARNING
460V
460V
460V
DLFU/DLFMU
G
– GRN
L 1 – RED – T 1
L 2 – WHT – T 2
L 3 – BLK – T 3
T 4 – T 7
T 5 – T 8
T 6 – T 9
T 10 – T 11 – T 12
P 1 – RED
P 2 – WHT
P 3 – BLK
P 4 – ORG
G – GRN
G
– GRN
L 1 – RED – T 1 – T 12
L 2 – WHT – T 2 – T 10
L 3 – BLK – T 3 – T 11
T 4 – T 7
T 5 – T 8
T 6 – T 9
P 1 – RED
P 2 – WHT
P 3 – BLK
P 4 – ORG
G – GRN
G
– GRN
L 1 – RED – T 1
L 2 – WHT – T 2
L 3 – BLK – T 3
L 5 – WHT – T 10
L 6 – BLK – T 11
L 4 – RED – T 12
T 4 – T 7
T 5 – T 8
T 6 – T 9
P 1 – RED
P 2 – WHT
P 3 – BLK
P 4 – OR
G – GRN
rev. 02/02
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dlfmu

Table of Contents