Drive Belts - Toro 03410TE Operator's Manual

Table of Contents

Advertisement

Cutting Unit
INSTALL THE CUTTING UNIT

DRIVE BELTS

(Fixed Cutting Units)
1.
Route (3) V-belts around the jackshaft pulleys and
reel pulleys.
1.
Tensioner bracket
2.
Belt tensioner
3.
Capscrew, (2) flatwashers, spacer & nut
INSTALL THE BELT TENSIONERS
TO THE CUTTING UNITS
(Floating Cutting Units)
1.
On pulley end of the front cutting units and both
ends of the rear cutting unit, remove the nut from
the bolt securing the carrier frame to the tensioner
bracket (Fig. 46).
2.
Install a spacer belt tension rod and washer onto the
capscrew.
Note: Position the belt tension rods in locked posi-
tion when installing. Loosen the jam nut and rotate
the rod to adjust the rod length for installation.
3.
Reinstall the nut previously removed.
32
Figure 47
INSTALL BELT TENSIONERS TO
THE CUTTING UNITS
(Fixed Cutting Units)
1.
On the pulley end of the front cutting units and
both ends of the rear cutting unit, install a washer,
spacer, belt tension rod and spacer on a capscrew
(Fig 46).
Note: Position belt tension rods in locked position
when installing. Loosen the jam nut and rotate the
rod to adjust the rod length for installation.
2.
Secure with the nut.
ADJUST THE PULLEY CLEANERS
1.
Adjust the cleaner bracket so it is centered in the
groove of the pulley and tighten the carriage bolt
and locknut.
2.
Adjust the cleaner bracket so there is approximately
.030–.060 clearance between the bracket and pul-
ley, then tighten the capscrew and locknut.
1.
Cleaner bracket
Figure 48

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 216

Table of Contents