Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
Media and Additional Parts
Description
Parts Catalog
Operator's Manual
Note: Determine the left and right sides of the machine
from the normal operating position.
1
Inspecting the Cutting Unit
Parts needed for this procedure:
1
Cutting unit
Procedure
After the cutting unit is removed from the box, inspect the
following:
1. Check each end of the reel for grease.
Note: Grease should be visibly evident in the internal
splines of the reel shaft.
2. Ensure that all nuts and bolts are securely tightened.
3. Make sure that the carrier frame suspension operates
freely and does not bind when moved back and forth.
Description
Cutting unit
No parts required
No parts required
Straight grease fitting
O-ring
Qty.
1
–
–
1
1
Qty.
1
Review the material and save in an appropriate place:
1
2
Cutting Unit Kickstand
No Parts Required
Procedure
Whenever the cutting unit has to be tipped to expose the
bedknife/reel, prop up the rear of the cutting unit with the
kickstand (supplied with the traction unit) to make sure that
the nuts on the back end of the bedbar adjusting screws are
not resting on the work surface
1. Cutting unit kickstand
4
Use
Inspect the cutting unit.
Use the kickstand when tipping the
cutting unit.
Adjust the rear shield.
Install the loose parts.
Use
(Figure
3).
Figure 3