3. Mount each frame mount tube to blower frame with (3)
capscrews, (6) washers and (3) nuts.
Install Drive Shaft
1. Remove (3) capscrews, (6) washers and (3) nuts
securing belt guard to blower frame (Fig. 5).
1
2
Figure 5
1. Belt guard
2. Slide shafts together.
3. Slide drive shaft onto blower shaft. Align mounting
holes in each shaft and slide together.
4. Secure with roll pin and (2) capscrews and nuts.
5. Re–install belt shaft guard with fasteners previously
removed.
Note: To assure proper blower operation, check/adjust
blower belt tension after first 20 hours of operation. Refer
to Adjusting Blower Belt.
2. PTO shaft
Rear Ballast
A GM 2XX series 2WD traction unit complies with the
ANSI B71.4–1990 Standard when (4) 35 lb. weights are
installed. Order two Weight Kits, Part No. 24–5780 from
your Toro Distributor.
Grease Blower
Before the Debris Blower is operated, the PTO shaft must
be greased to assure proper lubricating characteristics: refer
to Lubrication section of manual. Failure to properly grease
the unit will result in premature failure of critical parts.
9