Step4: Attach the conduit box support bar (J) to the inverter with two M5 screws. See figure 9.
Step5: Attach the conduit box (K) to the conduit box support bar (J) with two M4 screws. See figure 9.
Step6: Attach the conduit box (K) to the inverter with four self-threading screws (8-32). See figure 9.
Step7: Make all power and control connections to the inverter through the knockouts of the conduit box.
Step8: Attach the conduit box cover (L) to the conduit box (K) with four M4 screws. See figure 9.
Step9: Replace the inverter cover (G) removed in step2.
L
J
K
3. Installation procedure for group III
Use the torque value in table 1 when you torque a screw.
Step1: Do DC voltage test for safety.
Step2: Remove the front cover (M) from the inverter. See figure 10.
Step3: Place the support frame (N) under the inverter and align it with inverter's chassis. See figure 11.